|
|
| | Project | Location | Bid Date | Brief Description | |
| 275 | 6165-ToysRUs Renovation | Elk Grove, CA | 2/23/2010 | This is a hard bid project consisting of a 50,000 S.F. of retail remodel. The site work consists of repair, seall and restriping of existing parking lot. | More... |
| 279 | 6166-Sumner Middle School | Sumner, WA | 2/25/2010 | Enclose central courtyard, expansion of gymnasium, and expansion of cafeteria. | More... |
| 286 | 6171-DDR Mervyns Conversion - Sprouts | Santa Clarita, CA | 2/25/2010 | Conversions of an existing Mervyns store separating services and building space for a 29,000sf Sprouts. | More... |
| 208 | 6164-LACCD Library Resource Center | Wilmington, CA | 2/26/2010 | This is a hard bid project consisting of a 99,585 S.F. masonry building, with plaster, paint, and pvc roofing. The site work consists of screen walls, parking lot lighting, paving, landscape/irrigation, and off-site improvements. | More... |
| 283 | 5372 Walmart Remodel | Dallas, TX | 3/11/2010 | This is a hard bid project consisting of the remodel of an existing Walmart in Dallas, TX. Please direct all questions to the Project Estimator. | More... |
| 284 | 5373 Walmart Remodel | The Colony, TX | 3/11/2010 | This is a hard bid project consisting of the remodel of an existing Walmart in The Colony, TX. Please direct all questions to the Project Estimator. | More... |
| 289 | 6169-CMF 64-Bed Intermediate Care Facility | Vacaville, CA | 3/16/2010 | New 64-bed care facility for Dept of Corrections. Site work with some paving and perimeter fencing, CMU construction, steel framed roof system and membrane roofing. Detention equipment, and mechanical/electrical systems. | More... |
| 294 | #1182 Roadtec Training Center | Chattanooga, TN | 3/16/2010 | The project consists of an addition of a new facility in Chattanooga, TN. The project included but is not limited to: Site Work, Selective Demolition, Grading, Concrete, Polished Concrete, Pre-Stressed Concrete Planks, Masonry, Structural Steel, Misc. Metals, Rough & Finish Carpentry, Millwork, Solid Surfaces, Thermal Insulation, EIFS, Single Ply Roof, Doors & Hardware, Rolling Doors, Storefront Systems, Glazing & Mirrors, Drywall, Metal Studs, Acoustical Tile, Linear Metal Ceiling Panels, Porcelain & Quarry Tile, VCT Flooring, Carpet, Acoustical Wall Treatments, Painting & Wall Coverings, Toilet Partitions & Accessories, Wall Protection, Fire Protection Specialties, Operable Partitions, Food Service Equipment, Elevators, Fire Protection, Plumbing, HVAC, Electrical and Smoke/Fire Alarm Systems. | More... |
| 276 | 6166-MJC Student Services Bldg | Modesto, CA | 3/17/2010 | This is a hard bid project consisting of demolition & clearing for a 27,000 sf, new two story steel framed facility on spread footings, exterior walls are a combination of corrugated & flat panel metal siding. Interior construction includes metal studs & gypsum board partitions. Interior finishes include stained concrete, carpet, ceramic tile & wall finishes. Building systems include mechanical, eletrical, plumbing and a two-stop hydraulic elevator. Other construction consists of site improvements & accessible parking stalls. | More... |
| 292 | 5375 The Event Center (Lawn & Lake) | Beaumont, TX | 3/18/2010 | This is a hard bid project consisting of all civil and building trades, including specialty trades. | More... |
| 293 | #1177 Dalton Community Center | Dalton, GA | 3/18/2010 | The project is a 2 story pre-engineered metal building & structural steel building consisting of a total of approximately 44,000 sf located in Dalton, GA. The project also requires demolition, site work (including fine grading, paving & utilities) cast-in-place concrete, masonry (CMU & brick veneer) rough carpentry, thermal & moisture protection, modified bitumen roofing, aluminum composite panels, sealants, doors, finishes, specialties, athletic equipment, scoreboards, colored concrete, wood gym flooring, rubber sports flooring, epoxy flooring, signage, general casework, gym bleachers, window treatments, fire suppression, mechanical & electrical services. | More... |
| 291 | #1099 Lisega Manufacturing Facility | Sevierville, TN | 3/23/2010 | The project involves the construction of a new 31,150 sf office building and 93,122 sf manufacturing facility. The project requires site work, cast-in-place concrete, masonry, structural & misc. steel, carpentry, thermal/moisture protection, doors & windows, finishes, specialties, equipment, shades, special construction, elevators and MEP. | More... |
| 295 | #1176 Robotics Technology Park Phase 2 | Decatur, AL | 3/23/2010 | This project consists of a single steel framed structure with approximately 75% curtain wall & 25% stucco veneer. The project also features a Green Roofing System along with TPO & Metal Wall Panels. LEED requirements will apply. NOTE: Wage rates are attached in the supplemental conditions section of the specifications. Structural steel supplier must be AISC certified under category "I" | More... |
| 300 | 5385 Fire Station #5 | Fort Worth, TX | 3/25/2010 | This is a hard bid project consisting of the construction of a new fire station in Fort Worth, TX. Please direct all questions to the Project Estimator. | More... |
| 302 | #1184 UTC Library Foundation Package | Chattanooga, TN | 3/25/2010 | The foundation package consists of CIP concrete walls, footings, etc., Foundation Waterproofing, Earthwork, Erosion Control, Deep Pressure Grouting, Soil Stabilization by Rammed Aggregate Piers or Vibratory Stone Columns and Seeding Work. | More... |
| 296 | 5383 FWISD BP 033 | Fort Worth, TX | 3/30/2010 | This is a hard bid project consisting of renovations to 3 schools and an addition to 1 of the schools for Fort Worth ISD. Please direct all questions to the Project Estimator. | More... |
| 297 | 5380 CTC Student Center | Killeen, TX | 3/31/2010 | This is a hard bid project consisting of all civil and building trades. Please direct all questions to the Project Estimator. | More... |
| 209 | 6156-Taft College Modernation | Taft, CA | 3/4/2010 | This is a hard bid project consisting of the modernization of an existing 10,000 sf college technical arts building. This is a prevailing wage project. | More... |
| 287 | 6168-Tyee Middle School | Bellevue, WA | 3/4/2010 | Demolish existing school buildings; construct new 2 story middle school that is approximately 117,900 sf. | More... |
| 288 | 6170-Carnegie Arts Renovation/Addition | Turlock, CA | 3/4/2010 | Restoration of the historic Carnegie Library and the addition of a new multi level facility with a total building space of 19,230 square feet, site work, offsite work. Includes demolition of two story wood framed addition at rear of existing structure along with site demolition. Extensive restoration of remnants of existing building (interior partially burnt out three years ago) includes cleaning, painting or complete replacement/restoration of exterior finishes, also interior reconstruction. Staged shoring must be maintained as interior is rebuilt. New multilevel steel structure with metal roof, thin brick exterior, full height storefronts at entrances. This is a prevailing wage job subject to the current established prevailing wage and per diem rates for the City of Turlock. | More... |
| 285 | 5351 Lake Village Retirement Center | Lewisville, TX | 4/22/2010 | TENTATIVE BID DATE AND TIME. Plans are not yet in. | More... |
| 298 | New Middle School (Houston ISD) | Houston, TX | 4/6/2010 | TENTATIVE BID DATE AND TIME. Plans are not yet in. | More... |
| 299 | #6172 SCC Davis Center Phase 1-Bid #10017 | Davis, CA | 4/8/2010 | The work shall consist of, but not limited to the specific site work around Davis West Village Site and includes construction of approximately 14,255 assignable square feet of educational center space, parking lots, courtyard area and landscaping. The work includes but is not limited to site utilities and improvements, structural systems, interior and exterior walls, finishes, floor covering, ceilings, window systems, electrical/lighting systems, data/communication systems, mechanical/plumbing systems, & HVAC & Controls. | More... |
| 301 | 5386 Texas Point McFadden National Wildlife Headquarter Facility | Sabine Pass, TX | 4/8/2010 | This is a hard bid project consisting of the construction of a new 3,927sf elevated building, including timber, and it's associated sitework. | More... |
|